Container
2,500 TEU
Period :
14 days
Place :
Korea
Completion :
2023.12.26
Vessel Details
Year of Built 2010 Class KR Flag Korea [KR]
Specification for Scrubber
Main Engine
  • CR : 16,980 kW
  • Gas flow at design load : 152,133 kg/h
Auxiliary Engine
  • CR : 1,100 kW
  • Design load for Scrubber : 85% (1,100 kW)
  • Gas flow at design load : 6,477 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 165,087 kg/h
Time Table
Vessel berthed at Yeosu Ocean Shipyard (Yeosu)
  • 23 Nov 2023
Work Start
  • 27 Nov 2023
Work Complete (Including seatrial)
  • 26 Dec 2023