Tanker
318,000 DWT
Period :
11 days
Place :
Korea
Completion :
2023.07.22
Vessel Details
Year of Built 2011 Class LR Flag Liberia [LR]
Specification for Scrubber
Main Engine
  • CR : 20,874 kW
  • Gas flow at design load : 177,188 kg/h
Auxiliary Engine
  • CR : 1,360 kW
  • Design load for Scrubber : 70% (1,360 kW)
  • Gas flow at design load : 9,282 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 194,246 kg/h
Time Table
Vessel berthed at Samkang S&C shipyard (Korea)
  • 11-July-2023
Work Start
  • 10-July-2023
Work Complete (Including seatrial)
  • 22-July-2023