Bulk Carrier
205,000 DWT
Period :
14 days
Place :
Korea
Completion :
2023.07.07
Vessel Details
Year of Built 2007 Class NK Flag Marshall Is [MH]
Specification for Scrubber
Main Engine
  • CR : 14,102 kW
  • Design load for Scrubber : 100% (14,102 kW)
  • Gas flow at design load : 130,000 kg/h
Auxiliary Engine
  • CR : 660 kW
  • Design load for Scrubber : 80% (528 kW)
  • Gas flow at design load : 3,420 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 136,840 kg/h
Time Table
Vessel berthed at Samkang S&C shipyard (Gosung)
  • 23 Jun 2023
Work Start
  • 24 Jun 2023
Work Complete (Including seatrial)
  • 7 July 2023