Tanker
114,000 DWT
Period :
13 days
Place :
Korea
Completion :
2023.05.22
Vessel Details
Year of Built 2023 Class ABS Flag Marshall Is [MH]
Specification for Scrubber
Main Engine
  • CR : 13,000kW
  • Design load for Scrubber : 85% (11,050kW)
  • Gas flow at design load : 79,920kg/h
Auxiliary Engine
  • CR : 1,180kW
  • Design load for Scrubber : 85% (1,003kW)
  • Gas flow at design load : 7,030kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 93,980kg/h
Time Table
Vessel berthed at Samkang S&C shipyard (Gosung)
  • 8 May 2023
Work Start
  • 9 May 2023
Work Complete (Including seatrial)
  • 22 May 2023