Tanker
115,000 DWT
Period :
21 days
Place :
China
Completion :
2023.04.19
Vessel Details
Year of Built 2018 Class LR Flag Liberia [LR]
Specification for Scrubber
Main Engine
  • CR : 8,393kW
  • Design load for Scrubber : 100% (8,393kW)
  • Gas flow at design load : 79,200kg/h
Auxiliary Engine
  • CR : 970kW
  • Design load for Scrubber : 85% (825kW)
  • Gas flow at design load : 6,290kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 91,780kg/h
Time Table
Vessel berthed at Fujian shipyard (China)
  • 22 Mar 2023
Work Start
  • 22 Mar 2023
Work Complete (Including seatrial)
  • 19 Apr 2023