Tanker
150,000 DWT
Period :
21 days
Place :
Singapore
Completion :
2023.02.13
Vessel Details
Year of Built 2017 Class DNV Flag Turkiye [TR]
Specification for Scrubber
Main Engine
  • CR : 9,363 kW
  • Design load for Scrubber : 100%
  • Gas flow at design load : 84,860 kg/h
Auxiliary Engine
  • CR : 1,520 kW
  • Design load for Scrubber : 75% (1,140 kW)
  • Gas flow at design load : 9,282 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 103,424 kg/h
Time Table
Vessel berthed at Keppel shipyard (Singapore)
  • 20 Jan 2023
Work Start
  • 22 Jan 2023
Work Complete (Including seatrial)
  • 12 Feb 2023