Tanker
320,000 DWT
Period :
14 days
Place :
Korea
Completion :
2020.10.24
Vessel Details
Year of Built 2016 Class DNV. GL Flag Liberia
Specification for Scrubber
Main Engine
  • CR : 27,440kW
  • Design load for Scrubber : 70% (19,208kW)
  • Gas flow at design load :194,193kg/h
Auxiliary Engine
  • CR : 1,320kW
  • Design load for Scrubber : 85% (1,122kW)
  • Gas flow at design load : 8,160kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 210,513kg/h
Time Table
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 10 October 2020
Work Start
  • 10 October 2020
Work Complete (Including seatrial)
  • 24 October 2020