40,000 DWT LPG Carrier
Period :
14 days
Place :
Korea
Completion :
2023.01.20
Vessel Details
Year of Built 2023 Class LR Flag Marshall Is [MH]
Specification for Scrubber
Main Engine
  • CR : 7,410 kW
  • Design load for Scrubber : 90% (6,669 kW)
  • Gas flow at design load : 54,378 kg/h
Auxiliary Engine
  • CR : 1,320 kW
  • Design load for Scrubber : 85% (8,667 kW)
  • Gas flow at design load : 7,800 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 69,978 kg/h
Time Table
Vessel berthed at Samkang S&C shipyard (Gosung)
  • 6 Jan 2023
Work Start
  • 6 Jan 2023
Work Complete (Including seatrial)
  • 20 Jan 2023