84,000 DWT LPG Carrier
Period :
14 days
Place :
Korea
Completion :
2023.12.08
Vessel Details
Year of Built 2014 Class KR Flag Panama [PA]
Specification for Scrubber
Main Engine
  • CR : 8,610 kW
  • Design load for Scrubber : 100% (8,610 kW)
  • Gas flow at design load : 81,975 kg/h
Auxiliary Engine
  • CR : 1,200 kW
  • Design load for Scrubber : 90% (1,080 kW)
  • Gas flow at design load : 7,992 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 97,959 kg/h
Time Table
Vessel berthed at Yeosu Ocean Shipyard (Yeosu)
  • 21 Nov 2023
Work Start
  • 21 Nov 2023
Work Complete (Including seatrial)
  • 8 Dec 2023