Bulk Carrier
180,000 DWT
Period :
21 days
Place :
China
Completion :
2023.03.15
Vessel Details
Year of Built 2012 Class KR Flag Korea [KR]
Specification for Scrubber
Main Engine
  • CR : 11,500 kW
  • Gas flow at design load : 106,950 kg/h
Auxiliary Engine
  • CR : 1,135 kW
  • Design load for Scrubber : 85% (8,513 kW)
  • Gas flow at design load : 7,236 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 121,422 kg/h
Time Table
Vessel berthed at Xinya shipyard (China)
  • 18 Feb 2023
Work Start
  • 23 Feb 2023
Work Complete (Including seatrial)
  • 15 Mar 2024