Bulk Carrier
180,000 DWT
Period :
14 days
Place :
Korea
Completion :
2023.03.11
Vessel Details
Year of Built 2013 Class KR Flag Panama [PA]
Specification for Scrubber
Main Engine
  • CR : 18,660 kW
  • Design load for Scrubber : 60% (11,196 kW)
  • Gas flow at design load : 107,184 kg/h
Auxiliary Engine
  • CR : 440 kW
  • Design load for Scrubber : 85% (374 kW)
  • Gas flow at design load : 6,582 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 120,348 kg/h
Time Table
Vessel berthed at Samkang S&C shipyard (Gosung)
  • 28 Feb 2023
Work Start
  • 28 Feb 2023
Work Complete (Including seatrial)
  • 11 Mar 2023