Bulk Carrier
180,000 DWT
Period :
13 days
Place :
Korea
Completion :
2020.01.15
Vessel Details
Year of Built 2010 Class KR Flag Panama
Specification for Scrubber
Main Engine
  • CR : 17,780 kW
  • Design load for Scrubber : 85% ( 15,113 kW)
  • Gas flow at design load : 134,168 kg/h
Auxiliary Engine
  • CR : 690 kW
  • Design load for Scrubber : 85% (586 kW)
  • Gas flow at design load : 4,801 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 2 set A/E
  • Total Gas : 143,770 kg/h
Time Table
Vessel berthed at HanJin shipyard (Busan)
  • 02 January 2020
Work Start
  • 02 January 2020
Work Complete (Including seatrial)
  • 15 January 2020