Bulk Carrier
298,000 DWT
Period :
12 days
Place :
Korea
Completion :
2019.10.21
Vessel Details
Year of Built 2011 Class LR Flag United Kingdom
Specification for Scrubber
Main Engine
  • CR : 25,080 kW
  • Design load for Scrubber : 71% (17,807 kW)
  • Gas flow at design load : 172,134 kg/h
Auxiliary Engine
  • CR : 1,320 kW
  • Design load for Scrubber : 60% (792 kW)
  • Gas flow at design load : 9,508 kg/h
Boiler
  • esign load for Scrubber : N/A
  • Gas flow at design load : N/A
Scrubber
  • onnection to Scrubber tower : M/E + 3 set A/E
  • Operating condition for design : M/E + 3 set A/E
  • Total Gas : 200,658 kg/h
Time Table
Vessel berthed at Sungdong shipyard (Tongyeong)
  • 09 October 2019
Work Start
  • 09 October 2019
Work Complete (Including seatrial)
  • 21 October 2019